Plan 553
· Sizecurve · LIVE ON THE SHOPIFY APP STORE SINCE 2026-09-29 · 1 commits that day
PLAN AGAINST ACTUAL
Plan against actual
Each section of the plan against the sections of the actual, matched by heading. Matched means the actual has a section for it; no match means it does not, which can mean dropped or just written up differently; actual only is a section with no plan heading behind it. Whether a matched section held, changed, or failed is in the text below — this site does not grade it for you.
COMMITS BY HOUR, OCT 24, CHICAGO
Commits by hour
- 12am, 1 commits1
- 1am, 0 commits
- 2am, 0 commits
- 3am, 0 commits
- 4am, 0 commits
- 5am, 0 commits
- 6am, 0 commits
- 7am, 0 commits
- 8am, 0 commits
- 9am, 0 commits
- 10am, 0 commits
- 11am, 0 commits
- noon, 0 commits
- 1pm, 0 commits
- 2pm, 0 commits
- 3pm, 0 commits
- 4pm, 0 commits
- 5pm, 0 commits
- 6pm, 0 commits
- 7pm, 0 commits
- 8pm, 0 commits
- 9pm, 0 commits
- 10pm, 0 commits
- 11pm, 0 commits
- 12:09 AMPhase 553
Planned
Plan 553
Read the LinkedIn launch post numbers and the kill count. Combine the two bar-app fix branches (the assetlinks key, the Play tap targets) into one release-candidate branch, and prove it locally with the type check, tests and the production build, so a yes needs one deploy and no fixing.
Actual
Phase 553
- LinkedIn launch post, Buffer read at 02:53Z: 61 impressions, 32 reached, 2 reactions, 0 comments, 3.28% engagement.
- Kill read: still 49 of 50 views. The window closes 10-27.
- Bar app: branch rc/play-1 = master + fix/assetlinks-new-key + fix/play-a11y. The merge was clean. Type check clean; parse tests 277 of 277 pass, wells tests 17 of 17. The production build completes, and its assetlinks.json carries only the new upload key. Pushed to the app repo. Not merged to master, not deployed.