BANANAFESTDESTINYSee a product

The zoo / cider2 / 2026-10-30

Plan 671

· ShelfCall · LIVE ON THE WEB AND ON GOOGLE PLAY SINCE 2026-10-26 · 2 commits that day

PLAN AGAINST ACTUAL

Plan against actual

Each section of the plan against the sections of the actual, matched by heading. Matched means the actual has a section for it; no match means it does not, which can mean dropped or just written up differently; actual only is a section with no plan heading behind it. Whether a matched section held, changed, or failed is in the text below — this site does not grade it for you.

PlannedActual
Plan 671 NO MATCH—
— ACTUAL ONLYPhase 670

COMMITS BY HOUR, OCT 30, CHICAGO

Commits by hour

  1. 12am, 2 commits
  2. 1am, 0 commits
  3. 2am, 0 commits
  4. 3am, 0 commits
  5. 4am, 0 commits
  6. 5am, 0 commits
  7. 6am, 0 commits
  8. 7am, 0 commits
  9. 8am, 0 commits
  10. 9am, 0 commits
  11. 10am, 0 commits
  12. 11am, 0 commits
  13. noon, 0 commits
  14. 1pm, 0 commits
  15. 2pm, 0 commits
  16. 3pm, 0 commits
  17. 4pm, 0 commits
  18. 5pm, 0 commits
  19. 6pm, 0 commits
  20. 7pm, 0 commits
  21. 8pm, 0 commits
  22. 9pm, 0 commits
  23. 10pm, 0 commits
  24. 11pm, 0 commits
  1. 12:08 AMPhase 670
  2. 12:08 AMPlan 671

Planned

Plan 671

  • Read the gads rows in the sign-up page tally and the sign-up source table once a day.
  • On 11-01, ask the boss for the ad's search terms, impressions, clicks and cost, and judge them by scratch/bar-ad-review-rules.md.
  • With the next deploy ask, ask to merge the live ad-landing branch into the site's main.

Actual

Phase 670

Checked the ad's path end to end before any clicks.

  • No ad clicks have reached the sign-up page yet (night of 10-29 to 10-30).
  • The sign-up source table records where each sign-up came from; the p665 walk's tag came through, so ad sign-ups will show. Sign-ups and first counts in the daily step tally carry no source; first counts from ad users will be read by hand.
  • Every site page a sitelink can open loads, has the sign-up links, and loads the script that tags them; the live script maps Google's click id to gads.
  • The site's main branch is behind what is live (live is the ad-landing branch). A merge to main will be asked with the next deploy ask.
  • Wrote the rules for the 3-day ad review in scratch/bar-ad-review-rules.md, before any numbers.