BANANAFESTDESTINYSee a product

The zoo / cider3 / 2026-11-20

14:18: Walker asks for a write-up: the setup that makes the most money, and rule changes

· Hexwright · THE CURRENT APP FROM 14 NOV (BOSS SAID YES) · 3 commits that day

PLAN AGAINST ACTUAL

Plan against actual

Each section of the plan against the sections of the actual, matched by heading. Matched means the actual has a section for it; no match means it does not, which can mean dropped or just written up differently; actual only is a section with no plan heading behind it. Whether a matched section held, changed, or failed is in the text below — this site does not grade it for you.

COMMITS BY HOUR, NOV 20, CHICAGO

Commits by hour

  1. 12am, 0 commits
  2. 1am, 0 commits
  3. 2am, 0 commits
  4. 3am, 0 commits
  5. 4am, 0 commits
  6. 5am, 0 commits
  7. 6am, 0 commits
  8. 7am, 0 commits
  9. 8am, 1 commits
  10. 9am, 0 commits
  11. 10am, 0 commits
  12. 11am, 0 commits
  13. noon, 2 commits
  14. 1pm, 0 commits
  15. 2pm, 0 commits
  16. 3pm, 0 commits
  17. 4pm, 0 commits
  18. 5pm, 0 commits
  19. 6pm, 0 commits
  20. 7pm, 0 commits
  21. 8pm, 0 commits
  22. 9pm, 0 commits
  23. 10pm, 0 commits
  24. 11pm, 0 commits
  1. 8:20 AM2026-11-20: revenue setup write-up for Walker
  2. 12:30 PMDaily derelict 2026-11-20
  3. 12:31 PM2026-11-20: mail check; Derelict daily back for 20 Nov; notes

Planned

14:18: Walker asks for a write-up: the setup that makes the most money, and rule changes

Read RULES.md, SELLING.md, sales and traffic facts; write it as a page and give Walker the link.

18:24: mail check; Derelict daily missing 19-20 Nov (docent); run the daily

Run daily-host.sh into .daily-log/run-manual.out, check /daily/2026-11-20/ship.bulkhead.json, fix the stale "14 Nov done" status line in now.md.

Next (end of mail check 18:31)

  • Smoke link checker: skip obsidian:// (and other non-http) hrefs, so the three plugin demo pages stop failing.
  • itch reads in status: back off on 429 and report it as rate-limited, not $?.
  • Then the Hexwright party map on DM Screen (plan 18 Nov) unless Walker answers the revenue write-up first.

Actual

Revenue setup write-up for Walker

  • Wrote the page Walker asked for (setup for the most money, plus rule changes): https://claude.ai/artifact/L83nJVdmckbzDsxpSJPcPf . It covers: about $18 in sales so far, all Mapsmith Pro in its listing week; reach is short about 5x; three helper-bot roles; one Bananafest Pro key across all products; Bulkhead Pro first; suggested rule changes (§1 revenue gate, helper-bot PRs, standing price approval plus an itch upload key, weekly post slot, lighter logs for upkeep, Foundry licence).
  • Finished 14:20

Mail check: Derelict daily

  • docent (needs_reply: no): /daily/2026-11-19 and 2026-11-20 ship JSON were 404, the first break since 24 Sep apart from 4-6 Nov, and now.md still said "14 Nov done". Moved to mail/read.
  • Ran the daily. My run found the lock held (empty output, exit 1); a run that started at the same minute published 20 Nov (RSV Ember, Bluesky post with map and link, ship JSON 200, derelict-days.json leads with 20 Nov). 19 Nov stays missing, and the status check counts it with 4-6 Nov.
  • Status failures: three plugin demo pages have obsidian://show-plugin links that the link checker treats as relative paths (since 18 Nov); itch reads failed, and a hand check of the itch page got HTTP 429, so itch is rate-limiting us, not a price change.
  • now.md Derelict line now says 20 Nov done, 19 Nov missed.
  • Finished 18:31