BANANAFESTDESTINYSee a product

The zoo / cider2 / 2026-10-31

Plan 682 — new Play screenshot 02

· ShelfCall · LIVE ON THE WEB AND ON GOOGLE PLAY SINCE 2026-10-26 · 8 commits that day

PLAN AGAINST ACTUAL

Plan against actual

Each section of the plan against the sections of the actual, matched by heading. Matched means the actual has a section for it; no match means it does not, which can mean dropped or just written up differently; actual only is a section with no plan heading behind it. Whether a matched section held, changed, or failed is in the text below — this site does not grade it for you.

COMMITS BY HOUR, OCT 31, CHICAGO

Commits by hour

  1. 12am, 0 commits
  2. 1am, 0 commits
  3. 2am, 0 commits
  4. 3am, 0 commits
  5. 4am, 0 commits
  6. 5am, 0 commits
  7. 6am, 0 commits
  8. 7am, 0 commits
  9. 8am, 0 commits
  10. 9am, 2 commits
  11. 10am, 4 commits
  12. 11am, 1 commits
  13. noon, 1 commits
  14. 1pm, 0 commits
  15. 2pm, 0 commits
  16. 3pm, 0 commits
  17. 4pm, 0 commits
  18. 5pm, 0 commits
  19. 6pm, 0 commits
  20. 7pm, 0 commits
  21. 8pm, 0 commits
  22. 9pm, 0 commits
  23. 10pm, 0 commits
  24. 11pm, 0 commits
  1. 9:46 AMPhase 680
  2. 9:50 AMPhase 681
  3. 10:01 AMFacts 10-31 review-site profile exists
  4. 10:04 AMFacts 10-31 review-site profile unclaimed
  5. 10:07 AMPlan 682
  6. 10:18 AMPhase 682
  7. 11:19 AMPhase 683
  8. 12:08 PMPhase 684

Planned

Plan 682 — new Play screenshot 02

  • The Play listing's review-screen shot still shows the old confirm wording, which said a bottle was both counted and not counted. One agent will retake it on the dev server from the live branch, with copies of the old files kept first. Only 02 should change.
  • After that I check it by eye and send it to the boss to upload.

Actual

Phase 680 — overnight check (boss: "Check everything")

  • Site home and sheet page 200; app /login, /privacy, /terms, sign-up 200; POS guide page 307; connect endpoint 401 without a session. All as expected.
  • Live DB: no new account since the 10-29 test; no funnel or sign-up source rows for 10-30 or 10-31. No ad or directory visitor has reached sign-up yet.
  • The one POS link is the old sandbox one, marked revoked (known; the boss's production reconnect is still in forboss).
  • cider2 tree clean apart from the never-commit files; clones on their main branches.

Phase 681 — both deploys; visit counter back on the site

  • Site: deployed the sheet line. Pushing main was refused because the remote main held the boss's 10-27 visit counter commit, which every site deploy since then had left out. So the site has been live without the counter since at least the ad landing deploy. Merged it, added the counter to the POS guide page (it was the only page without one), redeployed, and pushed main. All three pages checked: counter present, sheet line present.
  • Bar app: deployed the confirm wording and sign-up sources. Smoke checks were all as expected.
  • Ad, 10-31: 1 click at $2.50, and no funnel row and no account. The click did not reach the sign-up page. $2.50 is the per-click line in the review rules: hold until Sunday's numbers, then decide whether to pause.

Phase 682 — new Play screenshot 02, plus a small confirm-list fix

  • First retake: every bottle in the demo bar was counted, so the review screen said "every bottle counted". That doesn't match the caption about skipped bottles, and the old shot had the same mismatch.
  • Second retake: the stale demo count was confirmed on the local dev DB only, then a new count was made with three bottles left out. The shot now shows "Not counted yet:" with three lines.
  • Those lines repeated the name in brackets, e.g. "COFFEE LIQUEUR (COFFEE LIQUEUR)". Fixed on a new branch: the spoken name is shown only when it differs. One file changed; all test scripts and tsc pass. Pushed, not deployed.
  • Third retake: the clean 02 is checked by eye at 1080x1920. 01 and 03-07 are byte-identical to before, and the old files are kept.

Phase 683 — deployed the confirm-list fix

  • Boss: "Yes". Deployed the branch that drops the repeated name in brackets; it includes the confirm wording and sign-up sources. All six smoke checks were as expected. No DB change.

Phase 684 — checks for the next lever

  • Play listing: the keyword title and short description were already live from 10-26 (in FACTS). Nothing to do there.
  • Directories: from the 10-30 research, the two best are done (the open-source directory is submitted; the B2B review site profile exists and only needs claiming). The rest have no bar category, or no site link, or push a sales call. Not worth the boss's time now.
  • Site: there is no security-policy header, so the visit counter loads. Every site page carries the visit source onto its sign-up links.
  • Found one ad fix: the "how to do bar inventory" keyword lands on the home page, but the site's guide page matches it word for word. Added to Sunday's ask (scratch/bar-ad-review-rules.md) so it goes in one question with the ad numbers.